Last autumn, I disassembled the layout completely. Carefully placed everything in boxes and waited for the move. This summer we progressed so far, that I could commence to rebuild a layout in a different location. The new room has different dimensions and hence, the track plan is also different. I choose to make two layouts. A lower level layout with Lionel 027 curves and a Maerklin AC transformer to run Lionel trains. And a top-level layout of Merkur 625 curves with a self-built AC/DC transformer to run both AC Lionel trains and DC Merkur and ETS trains. The layouts are still in a rudimentary shape and in the coming months, more details will be added.
Additionally, a new Merkur tank engine came along. It lights and puffs as it runs the wide oval.
A new beginning that still requires multiple improvements to make an alive and fully-flegded layout, but the trains run and the further decoration can start.
Not all old-structures fit on the new layout and I still have to pull electrical wires under the table for the lights. But then again, it can only get better in the coming months.


.jpg)

.jpg)


.jpg)
.jpg)
.jpg)







.jpg)
.jpg)
.jpg)
